{"id":8275,"date":"2025-09-19T15:41:54","date_gmt":"2025-09-19T18:41:54","guid":{"rendered":"https:\/\/vinq.us\/?p=8275"},"modified":"2026-01-03T20:08:59","modified_gmt":"2026-01-03T23:08:59","slug":"plano-periodo-chuvoso-gestao-riscos","status":"publish","type":"post","link":"https:\/\/vinq.us\/en\/plano-periodo-chuvoso-gestao-riscos\/","title":{"rendered":"Rainy Season Plan: Preventive Management and Integrated Risk Management"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"8275\" class=\"elementor elementor-8275\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-704002c elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"704002c\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-ae1bca8\" data-id=\"ae1bca8\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-8fc904a elementor-widget elementor-widget-text-editor\" data-id=\"8fc904a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">In tropical and subtropical regions that encompass much of Brazil, climate variability is characterized by intense and concentrated precipitation patterns. In recent years, the intensification of extreme events has increased the exposure of mining structures, such as pits, waste rock and tailings dumps, and dams, to hydrological, hydraulic, and geotechnical risks.<\/span><\/p><p><span style=\"font-weight: 400;\">In this context, the <\/span><b>Rainy Season Plan (PPC)<\/b><span style=\"font-weight: 400;\"> It has established itself as one of the main preventive engineering tools. In addition to preparing for rainy seasons, it organizes action plans that include special inspections, maintenance protocols, and emergency responses.<\/span><\/p><p><span style=\"font-weight: 400;\">More than meeting regulatory requirements, the PPC incorporates the logic of <\/span><i><span style=\"font-weight: 400;\">Risk-Informed Decision Making<\/span><\/i><span style=\"font-weight: 400;\"> (RIDM), basing decisions on risk analyses that integrate operational, environmental and social aspects.<\/span><\/p><p><span style=\"font-weight: 400;\">As highlighted in ICOLD guidelines and GISTM, the management of rainy periods must be integrated into the life cycle of geotechnical structures, reinforcing that water control and drainage are not episodic measures, but continuous practices that extend from design to closure.<\/span><\/p><h2>\u00a0<\/h2><h2><b>Plan in practice: Structural specifics<\/b><\/h2><p><span style=\"font-weight: 400;\">The effectiveness of the PPC does not derive from its mere formalization, but from its ability to adapt to the characteristics of each structure. It is not a generic model, but a plan adjusted to local geological, hydrological, and operational conditions.<\/span><\/p><h3><b>Structures and vulnerabilities<\/b><\/h3><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Cavas<\/b><span style=\"font-weight: 400;\">: susceptible to flooding of the pit bottom and erosion during heavy rains. The PPC should prioritize pumping redundancy, efficient drainage, and protection of downspouts.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Waste and tailings piles<\/b><span style=\"font-weight: 400;\">: more vulnerable to localized saturation and fines carryover. The PPC needs to strengthen surge monitoring, channel and dissipator maintenance, and critical slope reconfiguration.<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><b>Tailings dams<\/b><span style=\"font-weight: 400;\">: as essentially hydraulic structures, they require specific protocols for spillways, filters and drains, including redundancy in overflow channels and immediate response plans.<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">Therefore, it is clear that the PPC is, above all, a tailor-made methodological instrument, adjusted to the specific vulnerabilities of each typology.<\/span><\/p><h2>\u00a0<\/h2><h2><b>Prevention and control of anomalies<\/b><\/h2><p><span style=\"font-weight: 400;\">Many of the anomalies observed during rainy periods result from drainage and maintenance failures. The PPC organizes the prevention and mitigation of these occurrences through control barriers structured according to the logic <\/span><b>Bow Tie<\/b><span style=\"font-weight: 400;\">.<\/span><\/p><p><span style=\"font-weight: 400;\">This systematization allows potential failures to be transformed into a visual map of integrated risk management, reinforcing the practical nature of the PPC.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3ac6ce3 elementor-widget elementor-widget-image\" data-id=\"3ac6ce3\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"780\" height=\"318\" src=\"data:image\/svg+xml;charset=utf-8,%3Csvg xmlns%3D&#039;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#039; viewBox%3D&#039;0 0 1024 418&#039;%2F%3E\" class=\"attachment-large size-large wp-image-8280 ld-lazyload\" alt=\"\" data-src=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/Group-1178754697075029-1024x418.png\" data-srcset=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/Group-1178754697075029-1024x418.png 1024w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/Group-1178754697075029-300x123.png 300w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/Group-1178754697075029-18x7.png 18w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/Group-1178754697075029-1536x627.png 1536w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/Group-1178754697075029-2048x837.png 2048w\" data-sizes=\"(max-width: 780px) 100vw, 780px\" data-aspect=\"2.4497607655502\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4871a29 elementor-widget elementor-widget-text-editor\" data-id=\"4871a29\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<h2><b>Hydrological management and regulatory integration<\/b><\/h2><p><span style=\"font-weight: 400;\">Another pillar of the PPC is the continuous updating of hydrological studies. Reliance on outdated historical data is a critical failure factor, as recognized by ICOLD and CDA.<\/span><\/p><p><span style=\"font-weight: 400;\">The PPC must adopt a logic of <\/span><b>Adaptive Management<\/b><span style=\"font-weight: 400;\">, reassessing precipitation scenarios through:<\/span><\/p><ul><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Periodic review of IDF (Intensity\u2013Duration\u2013Frequency) curves;<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Updating project hydrographs;<\/span><\/li><li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Incorporation of hydrometeorological forecast models (<\/span><i><span style=\"font-weight: 400;\">forecasting<\/span><\/i><span style=\"font-weight: 400;\">) for operational support.<\/span><\/li><\/ul><p><span style=\"font-weight: 400;\">In Brazil, the PPC is based on current legislation, being used as good practice by instruments such as the <\/span><b>ANM Resolution 95\/2022<\/b><span style=\"font-weight: 400;\">, <\/span><b>ABNT NBR 13028 and 13029\/2024<\/b><span style=\"font-weight: 400;\"> and state guides, such as those from FEAM\/MG.<\/span><\/p><p><span style=\"font-weight: 400;\">At the international level, its logic is aligned with <\/span><b>GISTM Principle 7<\/b><span style=\"font-weight: 400;\">, which requires operational preparation for critical environmental scenarios.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4f89fdf elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"4f89fdf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6662d62 elementor-widget elementor-widget-text-editor\" data-id=\"6662d62\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">THE <\/span><b>Rainy Season Plan (PPC)<\/b><span style=\"font-weight: 400;\"> It has established itself as a highly important element in integrated risk management, whose function goes beyond developing seasonal plans. It represents the connection between updated hydrological data, field inspections, risk analysis, and informed decision-making.<\/span><\/p><p><span style=\"font-weight: 400;\">By adopting risk mitigation methodologies such as <\/span><b>PDCA, Bow-Tie and Risk-Informed Decision Making (RIDM)<\/b><span style=\"font-weight: 400;\">, according to ICOLD, GISTM, CDA and ANCOLD, the plan ceases to be just a regulatory obligation and becomes a strategic mechanism.<\/span><\/p><p><span style=\"font-weight: 400;\">When combined with robust drainage systems, the PPC becomes a <\/span><b>operational shield<\/b><span style=\"font-weight: 400;\">, capable of preventing the escalation of anomalies and strengthening the resilience of operations even under extreme rainfall events.<\/span><\/p><p><span style=\"font-weight: 400;\">In the <\/span><b>VinQ Geotechnics<\/b><span style=\"font-weight: 400;\">, we adopt this approach by integrating conceptual frameworks and aligning each PPC with the lifecycle and particularities of each structure. In this way, we treat the plan not only as a regulatory requirement, but as a <\/span><b>strategic preventive engineering instrument<\/b><span style=\"font-weight: 400;\">, which ensures safety, sustainability and compliance with standards comparable to international best practices.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t<div class=\"elementor-element elementor-element-3b09d08 e-flex e-con-boxed e-con e-parent\" data-id=\"3b09d08\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-1636014 elementor-widget elementor-widget-text-editor\" data-id=\"1636014\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Authors:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-a328051 e-con-full e-flex e-con e-child\" data-id=\"a328051\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-c23a86e e-con-full e-flex e-con e-child\" data-id=\"c23a86e\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-f6df6b2 e-con-full e-flex e-con e-child\" data-id=\"f6df6b2\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-ad2db93 e-con-full e-flex e-con e-child\" data-id=\"ad2db93\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-84b2adb elementor-widget elementor-widget-image\" data-id=\"84b2adb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"780\" height=\"780\" src=\"data:image\/svg+xml;charset=utf-8,%3Csvg xmlns%3D&#039;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#039; viewBox%3D&#039;0 0 800 800&#039;%2F%3E\" class=\"attachment-large size-large wp-image-8097 ld-lazyload\" alt=\"\" data-src=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320.jpeg\" data-srcset=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320.jpeg 800w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320-300x300.jpeg 300w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320-150x150.jpeg 150w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320-12x12.jpeg 12w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320-320x320.jpeg 320w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1693149511320-760x760.jpeg 760w\" data-sizes=\"(max-width: 780px) 100vw, 780px\" data-aspect=\"1\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-d2e5d1f e-con-full e-flex e-con e-child\" data-id=\"d2e5d1f\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-fc8bfb5 elementor-widget elementor-widget-heading\" data-id=\"fc8bfb5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">John Paul dos Santos<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-eb5c158 elementor-widget elementor-widget-text-editor\" data-id=\"eb5c158\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Bachelor in Mining Engineering (UFMG), Master in Civil Engineering and Management (University of Glasgow), Specialist in Geotechnical Engineering and Project Management.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-06f9a02 elementor-widget elementor-widget-text-editor\" data-id=\"06f9a02\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Mining Engineer specializing in geotechnics and project management, an international reference in dams and geotechnical structures applied to mining.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b80a04a elementor-align-left elementor-widget elementor-widget-button\" data-id=\"b80a04a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"http:\/\/www.linkedin.com\/in\/joaopaulodossantos\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fab-linkedin\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 32H31.9C14.3 32 0 46.5 0 64.3v383.4C0 465.5 14.3 480 31.9 480H416c17.6 0 32-14.5 32-32.3V64.3c0-17.8-14.4-32.3-32-32.3zM135.4 416H69V202.2h66.5V416zm-33.2-243c-21.3 0-38.5-17.3-38.5-38.5S80.9 96 102.2 96c21.2 0 38.5 17.3 38.5 38.5 0 21.3-17.2 38.5-38.5 38.5zm282.1 243h-66.4V312c0-24.8-.5-56.7-34.5-56.7-34.6 0-39.9 27-39.9 54.9V416h-66.4V202.2h63.7v29.2h.9c8.9-16.8 30.6-34.5 62.9-34.5 67.2 0 79.7 44.3 79.7 101.9V416z\"><\/path><\/svg>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Access Linkedin profile<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-bafb0e0 e-con-full e-flex e-con e-child\" data-id=\"bafb0e0\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t<div class=\"elementor-element elementor-element-b50ba56 e-con-full e-flex e-con e-child\" data-id=\"b50ba56\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t<div class=\"elementor-element elementor-element-f841efe e-con-full e-flex e-con e-child\" data-id=\"f841efe\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-2bd87ac elementor-widget elementor-widget-image\" data-id=\"2bd87ac\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"780\" height=\"780\" src=\"data:image\/svg+xml;charset=utf-8,%3Csvg xmlns%3D&#039;http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg&#039; viewBox%3D&#039;0 0 800 800&#039;%2F%3E\" class=\"attachment-large size-large wp-image-8103 ld-lazyload\" alt=\"\" data-src=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159.jpeg\" data-srcset=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159.jpeg 800w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159-300x300.jpeg 300w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159-150x150.jpeg 150w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159-12x12.jpeg 12w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159-320x320.jpeg 320w, https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/1747169731159-760x760.jpeg 760w\" data-sizes=\"(max-width: 780px) 100vw, 780px\" data-aspect=\"1\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-41379f2 e-con-full e-flex e-con e-child\" data-id=\"41379f2\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-af3e358 elementor-widget elementor-widget-heading\" data-id=\"af3e358\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Matheus Vicentini<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2f22bd8 elementor-widget elementor-widget-text-editor\" data-id=\"2f22bd8\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Civil Engineer (Unilavras), Specialist in Geotechnical Engineering (PUC Minas).<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-56da19a elementor-widget elementor-widget-text-editor\" data-id=\"56da19a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Civil Engineer with experience in geotechnics applied to mining, with experience in projects, audits and dam decommissioning works.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-952e1bd elementor-align-left elementor-widget elementor-widget-button\" data-id=\"952e1bd\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.linkedin.com\/in\/matheus-vicentini-939a82161\/\" target=\"_blank\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t<span class=\"elementor-button-icon\">\n\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fab-linkedin\" viewbox=\"0 0 448 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M416 32H31.9C14.3 32 0 46.5 0 64.3v383.4C0 465.5 14.3 480 31.9 480H416c17.6 0 32-14.5 32-32.3V64.3c0-17.8-14.4-32.3-32-32.3zM135.4 416H69V202.2h66.5V416zm-33.2-243c-21.3 0-38.5-17.3-38.5-38.5S80.9 96 102.2 96c21.2 0 38.5 17.3 38.5 38.5 0 21.3-17.2 38.5-38.5 38.5zm282.1 243h-66.4V312c0-24.8-.5-56.7-34.5-56.7-34.6 0-39.9 27-39.9 54.9V416h-66.4V202.2h63.7v29.2h.9c8.9-16.8 30.6-34.5 62.9-34.5 67.2 0 79.7 44.3 79.7 101.9V416z\"><\/path><\/svg>\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Access Linkedin profile<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Discover how the Rainy Season Plan strengthens safety in dams and mining structures with preventive risk management.<\/p>","protected":false},"author":3,"featured_media":8258,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[18,20,23,22],"tags":[],"class_list":["post-8275","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-barragens","category-geotecnia","category-normas","category-sustentabilidade"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos - VinQ \u00b7 Geotecnia<\/title>\n<meta name=\"description\" content=\"Descubra como o Plano de Per\u00edodo Chuvoso fortalece a seguran\u00e7a em barragens e estruturas de minera\u00e7\u00e3o com gest\u00e3o preventiva de riscos.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/vinq.us\/en\/plano-periodo-chuvoso-gestao-riscos\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos - VinQ \u00b7 Geotecnia\" \/>\n<meta property=\"og:description\" content=\"Descubra como o Plano de Per\u00edodo Chuvoso fortalece a seguran\u00e7a em barragens e estruturas de minera\u00e7\u00e3o com gest\u00e3o preventiva de riscos.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/vinq.us\/en\/plano-periodo-chuvoso-gestao-riscos\/\" \/>\n<meta property=\"og:site_name\" content=\"VinQ \u00b7 Geotecnia\" \/>\n<meta property=\"article:published_time\" content=\"2025-09-19T18:41:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-03T23:08:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"vinq\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"vinq\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/\"},\"author\":{\"name\":\"vinq\",\"@id\":\"https:\/\/99.79.193.6:443\/#\/schema\/person\/4bf7c915cc64fc1813b7a22fabec09a6\"},\"headline\":\"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos\",\"datePublished\":\"2025-09-19T18:41:54+00:00\",\"dateModified\":\"2026-01-03T23:08:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/\"},\"wordCount\":913,\"image\":{\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png\",\"articleSection\":[\"Barragens\",\"Geotecnia\",\"Normas\",\"Sustentabilidade\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/\",\"url\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/\",\"name\":\"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos - VinQ \u00b7 Geotecnia\",\"isPartOf\":{\"@id\":\"https:\/\/99.79.193.6:443\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png\",\"datePublished\":\"2025-09-19T18:41:54+00:00\",\"dateModified\":\"2026-01-03T23:08:59+00:00\",\"author\":{\"@id\":\"https:\/\/99.79.193.6:443\/#\/schema\/person\/4bf7c915cc64fc1813b7a22fabec09a6\"},\"description\":\"Descubra como o Plano de Per\u00edodo Chuvoso fortalece a seguran\u00e7a em barragens e estruturas de minera\u00e7\u00e3o com gest\u00e3o preventiva de riscos.\",\"breadcrumb\":{\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage\",\"url\":\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png\",\"contentUrl\":\"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png\",\"width\":1200,\"height\":628},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/vinq.us\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/99.79.193.6:443\/#website\",\"url\":\"https:\/\/99.79.193.6:443\/\",\"name\":\"VinQ \u00b7 Geotecnia\",\"description\":\"Transforma\u00e7\u00f5es de desafios em solu\u00e7\u00f5es s\u00f3lidas.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/99.79.193.6:443\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/99.79.193.6:443\/#\/schema\/person\/4bf7c915cc64fc1813b7a22fabec09a6\",\"name\":\"vinq\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/72a06bc5ba2fb28c1b704ce1845b0849a5a7f830d9d8cbc09a7e1d67b9090c8e?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/72a06bc5ba2fb28c1b704ce1845b0849a5a7f830d9d8cbc09a7e1d67b9090c8e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/72a06bc5ba2fb28c1b704ce1845b0849a5a7f830d9d8cbc09a7e1d67b9090c8e?s=96&d=mm&r=g\",\"caption\":\"vinq\"},\"url\":\"https:\/\/vinq.us\/en\/author\/vinq\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos - VinQ \u00b7 Geotecnia","description":"Descubra como o Plano de Per\u00edodo Chuvoso fortalece a seguran\u00e7a em barragens e estruturas de minera\u00e7\u00e3o com gest\u00e3o preventiva de riscos.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/vinq.us\/en\/plano-periodo-chuvoso-gestao-riscos\/","og_locale":"en_US","og_type":"article","og_title":"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos - VinQ \u00b7 Geotecnia","og_description":"Descubra como o Plano de Per\u00edodo Chuvoso fortalece a seguran\u00e7a em barragens e estruturas de minera\u00e7\u00e3o com gest\u00e3o preventiva de riscos.","og_url":"https:\/\/vinq.us\/en\/plano-periodo-chuvoso-gestao-riscos\/","og_site_name":"VinQ \u00b7 Geotecnia","article_published_time":"2025-09-19T18:41:54+00:00","article_modified_time":"2026-01-03T23:08:59+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png","type":"image\/png"}],"author":"vinq","twitter_card":"summary_large_image","twitter_misc":{"Written by":"vinq","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#article","isPartOf":{"@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/"},"author":{"name":"vinq","@id":"https:\/\/99.79.193.6:443\/#\/schema\/person\/4bf7c915cc64fc1813b7a22fabec09a6"},"headline":"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos","datePublished":"2025-09-19T18:41:54+00:00","dateModified":"2026-01-03T23:08:59+00:00","mainEntityOfPage":{"@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/"},"wordCount":913,"image":{"@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage"},"thumbnailUrl":"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png","articleSection":["Barragens","Geotecnia","Normas","Sustentabilidade"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/","url":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/","name":"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos - VinQ \u00b7 Geotecnia","isPartOf":{"@id":"https:\/\/99.79.193.6:443\/#website"},"primaryImageOfPage":{"@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage"},"image":{"@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage"},"thumbnailUrl":"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png","datePublished":"2025-09-19T18:41:54+00:00","dateModified":"2026-01-03T23:08:59+00:00","author":{"@id":"https:\/\/99.79.193.6:443\/#\/schema\/person\/4bf7c915cc64fc1813b7a22fabec09a6"},"description":"Descubra como o Plano de Per\u00edodo Chuvoso fortalece a seguran\u00e7a em barragens e estruturas de minera\u00e7\u00e3o com gest\u00e3o preventiva de riscos.","breadcrumb":{"@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#primaryimage","url":"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png","contentUrl":"https:\/\/vinq.us\/wp-content\/uploads\/2025\/09\/ARTIGO-CAPA-05-3.png","width":1200,"height":628},{"@type":"BreadcrumbList","@id":"https:\/\/vinq.us\/plano-periodo-chuvoso-gestao-riscos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/vinq.us\/"},{"@type":"ListItem","position":2,"name":"Plano de Per\u00edodo Chuvoso: Gest\u00e3o Preventiva e Integrada a Gest\u00e3o de Riscos"}]},{"@type":"WebSite","@id":"https:\/\/99.79.193.6:443\/#website","url":"https:\/\/99.79.193.6:443\/","name":"VinQ \u00b7 Geotecnia","description":"Transforma\u00e7\u00f5es de desafios em solu\u00e7\u00f5es s\u00f3lidas.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/99.79.193.6:443\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/99.79.193.6:443\/#\/schema\/person\/4bf7c915cc64fc1813b7a22fabec09a6","name":"vinq","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/72a06bc5ba2fb28c1b704ce1845b0849a5a7f830d9d8cbc09a7e1d67b9090c8e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/72a06bc5ba2fb28c1b704ce1845b0849a5a7f830d9d8cbc09a7e1d67b9090c8e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/72a06bc5ba2fb28c1b704ce1845b0849a5a7f830d9d8cbc09a7e1d67b9090c8e?s=96&d=mm&r=g","caption":"vinq"},"url":"https:\/\/vinq.us\/en\/author\/vinq\/"}]}},"_links":{"self":[{"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/posts\/8275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/comments?post=8275"}],"version-history":[{"count":4,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/posts\/8275\/revisions"}],"predecessor-version":[{"id":8284,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/posts\/8275\/revisions\/8284"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/media\/8258"}],"wp:attachment":[{"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/media?parent=8275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/categories?post=8275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vinq.us\/en\/wp-json\/wp\/v2\/tags?post=8275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}